Documents and approval
How to revise an electrical estimate
When outlets, routes or equipment change, update both the total and the explanation. A customer can review the new version more easily when additions, removals and recalculations are explicit.
What to include
Keep the previously agreed copy outside the editable draft. Record the reason and recalculate affected items, including materials. Send a new PDF or publish a new customer link with an explanation.
What to watch for
Do not treat silence as approval of extra work. Obtain a clear response before carrying out the changed scope.
Practical example
Example explanation: “Added two outlets and nine metres of routing; removed the previously proposed light.” Recalculate materials alongside labour and identify the document replaced. Keep the old agreed copy for comparison. The new total must include both additions and removals.
Before you send
- Match quantities to measurements and the agreed work list.
- Check units and rates: the price and quantity must use the same unit.
- State who buys materials and which tasks are excluded.
- Save the proposed version and review the document from the customer’s perspective.
Continue in SayQuote
- Open the app and prepare your own price list.
- Type a description or dictate the work. AI processing requires an available service and sufficient allowance.
- Review the draft, clarify items and prices, and add your details and conditions.
- Save the estimate and export a PDF. Sign in for a customer link; availability depends on plan and limits.
Questions and answers
How should I explain a higher revised total?
List scope changes and related materials. Two additional outlets may require a new route as well as accessories. Compare the two versions on consistent terms and explain rate changes separately when quantities stay the same.
Can I send the result to a customer?
After review, enter the confirmed items in SayQuote. The app produces a PDF and supports publishing a customer copy by link where the feature is available.