By work type
Lighting installation estimate
Separate lighting work into supply preparation, mounting and connection. Fitting count alone does not capture high-level access, complex chandelier assembly or profile installation.
What to include
Record ceiling type, working height and fixing method. For LED strips, list profiles, strips, drivers and controls separately when supplied. Explicitly identify fitting assembly and support preparation.
What to watch for
Do not combine metres of strip lighting and individual fittings under one undifferentiated unit rate.
Estimate worksheet
The quantities below illustrate a structure; they are not measurements for your site. Enter your own rates in a single currency to calculate line totals. This worksheet does not calculate tax, discounts or additional costs.
Before you send
- Match quantities to measurements and the agreed work list.
- Check units and rates: the price and quantity must use the same unit.
- State who buys materials and which tasks are excluded.
- Save the proposed version and review the document from the customer’s perspective.
Continue in SayQuote
- Open the app and prepare your own price list.
- Type a description or dictate the work. AI processing requires an available service and sufficient allowance.
- Review the draft, clarify items and prices, and add your details and conditions.
- Save the estimate and export a PDF. Sign in for a customer link; availability depends on plan and limits.
Questions and answers
How do I allow for chandelier assembly and high-level work?
Confirm model, weight, assembly requirements and access before pricing. List assembly and special access separately where not included in basic fitting. Agree equipment hire and support preparation with the responsible provider.
Can I send the result to a customer?
After review, enter the confirmed items in SayQuote. The app produces a PDF and supports publishing a customer copy by link where the feature is available.