By project type
Office electrical estimate
Office costs depend on desks, shared equipment and access restrictions. Organise the estimate by zone so a seating-plan change does not require renegotiating the entire project.
What to include
Agree desk counts, meeting rooms, kitchen and server area. Show power and data cabling separately. Where evening or weekend work has an agreed surcharge, display it as a separate item.
What to watch for
Do not include network, server or equipment configuration within electrical installation unless separately agreed.
Estimate worksheet
The quantities below illustrate a structure; they are not measurements for your site. Enter your own rates in a single currency to calculate line totals. This worksheet does not calculate tax, discounts or additional costs.
Before you send
- Match quantities to measurements and the agreed work list.
- Check units and rates: the price and quantity must use the same unit.
- State who buys materials and which tasks are excluded.
- Save the proposed version and review the document from the customer’s perspective.
Continue in SayQuote
- Open the app and prepare your own price list.
- Type a description or dictate the work. AI processing requires an available service and sufficient allowance.
- Review the draft, clarify items and prices, and add your details and conditions.
- Save the estimate and export a PDF. Sign in for a customer link; availability depends on plan and limits.
Questions and answers
How should desk outlet assemblies be measured?
Agree the contents of one assembly and the desk count. Sixteen identical assemblies count as sixteen sets only if each set is clearly defined. Measure shared trunking and routes separately; do not automatically multiply their length by the number of desks.
Can I send the result to a customer?
After review, enter the confirmed items in SayQuote. The app produces a PDF and supports publishing a customer copy by link where the feature is available.