By work type
Electrical final-fix estimate
Final fitting follows prepared routes and completed finishes. Distinguish accessory fitting, light connections and correction of issues discovered in the earlier work.
What to include
Check box readiness, cable labels and accessory completeness. Record frame and fitting models. If another contractor did the preparation, agree an inspection and a process for pricing corrective work first.
What to watch for
Do not promise a fixed installation scope before checking readiness: unsuitable boxes and missing parts change the work.
Estimate worksheet
The quantities below illustrate a structure; they are not measurements for your site. Enter your own rates in a single currency to calculate line totals. This worksheet does not calculate tax, discounts or additional costs.
Before you send
- Match quantities to measurements and the agreed work list.
- Check units and rates: the price and quantity must use the same unit.
- State who buys materials and which tasks are excluded.
- Save the proposed version and review the document from the customer’s perspective.
Continue in SayQuote
- Open the app and prepare your own price list.
- Type a description or dictate the work. AI processing requires an available service and sufficient allowance.
- Review the draft, clarify items and prices, and add your details and conditions.
- Save the estimate and export a PDF. Sign in for a customer link; availability depends on plan and limits.
Questions and answers
How do I price final fitting after another contractor?
Start with a readiness inspection and a list of limitations. Separate basic fitting from corrective work. Where concealed conditions are unknown, state the clarification process. Do not promise to correct every defect within an ordinary accessory-fitting rate.
Can I send the result to a customer?
After review, enter the confirmed items in SayQuote. The app produces a PDF and supports publishing a customer copy by link where the feature is available.