By work type
Electrical first-fix estimate
First-fix work prepares routes and installation positions before finishes. State the stage deliverables and the tasks reserved for final fitting.
What to include
List setting out, channels, boxes and cable installation. State whether panel assembly, labelling and interim checks are included. Agree how concealed sections will be documented before they are covered.
What to watch for
“First fix” does not define a universal scope. Explicitly list exclusions such as accessories, fittings, making good and final decoration.
Estimate worksheet
The quantities below illustrate a structure; they are not measurements for your site. Enter your own rates in a single currency to calculate line totals. This worksheet does not calculate tax, discounts or additional costs.
Before you send
- Match quantities to measurements and the agreed work list.
- Check units and rates: the price and quantity must use the same unit.
- State who buys materials and which tasks are excluded.
- Save the proposed version and review the document from the customer’s perspective.
Continue in SayQuote
- Open the app and prepare your own price list.
- Type a description or dictate the work. AI processing requires an available service and sufficient allowance.
- Review the draft, clarify items and prices, and add your details and conditions.
- Save the estimate and export a PDF. Sign in for a customer link; availability depends on plan and limits.
Questions and answers
What should be handed over after first fix?
Agree the completed-task list, labelling and available concealed-work records. Photos before covering help orientation but do not replace required checks. Record remaining final-fix tasks so they are not assumed to have already been included.
Can I send the result to a customer?
After review, enter the confirmed items in SayQuote. The app produces a PDF and supports publishing a customer copy by link where the feature is available.