By work type
Outdoor lighting estimate
Outdoor lighting needs allowances for routes, mounting and site access. Separate electrical installation, excavation and reinstatement so the offer has clear boundaries.
What to include
Agree light positions, controls and supply points. List trenches, column foundations and path reinstatement separately. Where equipment is supplied, specify models and intended operating conditions.
What to watch for
Site length is not cable length: the route, diversions and vertical runs must be measured separately.
Estimate worksheet
The quantities below illustrate a structure; they are not measurements for your site. Enter your own rates in a single currency to calculate line totals. This worksheet does not calculate tax, discounts or additional costs.
Before you send
- Match quantities to measurements and the agreed work list.
- Check units and rates: the price and quantity must use the same unit.
- State who buys materials and which tasks are excluded.
- Save the proposed version and review the document from the customer’s perspective.
Continue in SayQuote
- Open the app and prepare your own price list.
- Type a description or dictate the work. AI processing requires an available service and sufficient allowance.
- Review the draft, clarify items and prices, and add your details and conditions.
- Save the estimate and export a PDF. Sign in for a customer link; availability depends on plan and limits.
Questions and answers
Who should price excavation and path reinstatement?
Assign responsibility before sending the offer. If included in your scope, obtain measurements and agree reinstatement methods. If another contractor performs them, identify the exclusion and the site readiness required for electrical work.
Can I send the result to a customer?
After review, enter the confirmed items in SayQuote. The app produces a PDF and supports publishing a customer copy by link where the feature is available.